Solar Subsidy by State in India 2026: Central + State Top-Ups, Amounts and How to Apply

Last Updated: 16 November 2026

Electricity bills rarely go down. Fans, coolers, fridges and air conditioners run longer every summer, and in most Indian homes the monthly bill has become one of the biggest fixed expenses. Rooftop solar promises a way out: install panels once, and let the sun pay a large part of your bill for the next 20 years or more. The idea is simple, but one question stops most families before they start – how much will it actually cost, and how much will the government pay?

The answer depends on where you live. That is the whole point of this guide. India has two layers of solar subsidy. The first layer comes from the central government and is the same in every state. The second layer comes from your state government, and it changes completely from one state to another. In some states it adds as much as Rs 50,000 to your subsidy. In others it adds nothing at all. That single difference can change your final cost by tens of thousands of rupees, which is why a state-wise comparison matters more than any single national figure.

This guide puts everything in one place: the central subsidy, a verified state-wise top-up table, the free-panel schemes for BPL families, a step-by-step application guide, how to check your subsidy status, and worked net-cost examples for 1 kW, 2 kW and 3 kW systems. Every figure comes from official sources where possible. Where a figure could not be verified officially, this guide says so plainly instead of copying a competitor’s number.

Quick Facts – Solar Subsidy at a Glance

Item Detail
Scheme PM Surya Ghar: Muft Bijli Yojana
Central subsidy (1 kW) Rs 30,000
Central subsidy (2 kW) Rs 60,000
Central subsidy (3 kW or more) Rs 78,000 (maximum)
Central subsidy in hill and north-eastern states (3 kW) Rs 85,800
Free electricity target Up to 300 units per month
Overall target 1 crore households
Scheme valid till 31 March 2027
Application portal pmsuryaghar.gov.in
Highest total subsidy, ordinary household (3 kW) Assam: up to Rs 1,30,800 (central Rs 85,800 + state Rs 45,000)
Total subsidy in Uttar Pradesh (3 kW) Rs 1,08,000 (central Rs 78,000 + state Rs 30,000)

The table above makes one thing clear: the central subsidy is the same everywhere, but the total benefit depends on your state. Always check your state’s top-up before you sign a vendor contract.

PM Surya Ghar Yojana – The Central Subsidy in Brief

PM Surya Ghar: Muft Bijli Yojana is the central government’s rooftop solar scheme, launched in February 2024 with a target of 1 crore households. It pays a direct subsidy into the homeowner’s bank account for installing a grid-connected rooftop solar system. The central rates are simple: Rs 30,000 per kW for the first 2 kW, Rs 18,000 for the third kW, and a maximum of Rs 78,000. That means Rs 30,000 for 1 kW, Rs 60,000 for 2 kW and Rs 78,000 for 3 kW or more. Even if you install a 5 kW or 10 kW system, the central subsidy stays at Rs 78,000.

Hill states and north-eastern states are treated as a special category and get 10 percent higher central assistance. There the rates are Rs 33,000 for 1 kW, Rs 66,000 for 2 kW and Rs 85,800 for 3 kW or more. This category covers Uttarakhand, Himachal Pradesh, Jammu and Kashmir, Ladakh, the north-eastern states and the island territories. Group housing societies and RWAs get Rs 18,000 per kW for common facilities, on systems up to 500 kW.

A 3 kW system generates roughly 300 to 360 units a month, which is where the “300 free units” promise comes from. The subsidy is paid only after installation, DISCOM inspection, net meter installation and submission of bank details on the portal. For full details of the central scheme, eligibility and documents, read our PM Surya Ghar Yojana 2026 guide.

One rule applies in every state: the subsidy is paid only for DCR panels. DCR means Domestic Content Requirement – both the solar cells and the modules must be manufactured in India and listed on MNRE’s ALMM list. Imported panels get no subsidy, however good they are. Your vendor must also be empanelled with your DISCOM.

Solar Subsidy by State in India 2026 – Full Table

The table below lists every state’s top-up, its cap, the condition attached to it, and where to apply. The central subsidy is additional to these figures. To get your total subsidy, add the central subsidy to your state’s top-up. Where a top-up could not be verified officially, the table says so honestly.

State / UT State top-up Cap Condition Where to apply
Uttar Pradesh Rs 15,000 per kW Rs 30,000 (on 2 kW) All domestic consumers UPNEDA, via the national portal
Haryana (Antyodaya families) Rs 25,000 per kW Rs 50,000 (on 2 kW) Family income up to Rs 1.80 lakh National portal + DISCOM portal
Haryana (general consumers) Rs 10,000 per kW Rs 20,000 (on 2 kW) General domestic consumers (as per state reports) National portal + DISCOM portal
Delhi Rs 10,000 per kW + Rs 3 per unit generated Rs 30,000 + generation incentive for 5 years Domestic consumers, Delhi Solar Policy 2023 Delhi Solar Portal
Assam Rs 15,000 per kW Rs 45,000 (on 3 kW) All domestic consumers, APDCL National portal, APDCL
Rajasthan Rs 17,000 flat Rs 17,000 Only Mukhyamantri Nishulk Bijli Yojana beneficiaries Bijli Mitra portal, DISCOM
Tamil Nadu Rs 20,000 (for a 1 kW plant only) Rs 20,000 Only 1 kW grid-connected domestic plant, TANGEDCO connection TEDA / national portal
Chhattisgarh Rs 15,000 per kW (reported; not officially confirmed) Rs 30,000 (on 2 kW) Domestic consumers (as reported) National portal; confirm with CREDA / CSPDCL
Bihar (general consumers) No verified general top-up found – Reports claim Rs 20,000 to Rs 45,000; none confirmed officially National portal; confirm with BREDA
Karnataka No verified state top-up found – Central subsidy only National portal, BESCOM
Gujarat No verified state top-up found – Some reports claim Rs 20,000; not confirmed National portal; confirm with GEDA
Maharashtra (general consumers) No general top-up – Central subsidy only; SMART scheme for BPL separately National portal, MSEDCL
Punjab No verified state top-up found – Central subsidy only National portal, PSPCL
Kerala No verified state top-up found – Central subsidy only National portal, KSEB
Madhya Pradesh No verified state top-up found – Central subsidy only National portal, DISCOM
Uttarakhand / Himachal Pradesh No state top-up, but higher central subsidy Rs 85,800 (on 3 kW) Special category states National portal
Jharkhand, West Bengal, Puducherry, Ladakh, Jammu and Kashmir Top-ups claimed in reports; not officially verified – Confirm with your DISCOM before applying National portal, DISCOM

Now let us look at the major states one by one, because the conditions behind each number matter as much as the number itself.

Solar Subsidy in Uttar Pradesh – The UPNEDA Top-Up

Uttar Pradesh has the clearest and strongest state top-up in India. Every domestic consumer gets an additional Rs 15,000 per kW from the state government, capped at Rs 30,000 on 2 kW. The basis is Section 7.3 of the UP Solar Energy Policy 2022. The combined subsidy works out to Rs 45,000 on 1 kW, Rs 90,000 on 2 kW and Rs 1,08,000 on 3 kW. Above 3 kW the total stays at Rs 1,08,000, because both components have hit their caps.

The state subsidy is administered by UPNEDA (Uttar Pradesh New and Renewable Energy Development Agency) and is paid separately from the central grant, usually about 7 days after the central subsidy claim appears on the national portal. UPNEDA publishes the approved beneficiaries in numbered State Subsidy Lists. The latest, List 68, is dated 24 September 2026 and covers 34,060 approved applicants, 113,016 kWp of capacity and Rs 102.17 crore of state subsidy. The previous list, List 67 dated 31 August 2026, was the largest recent batch with 90,949 applicants and Rs 272.83 crore. Search these lists by your application number (it starts with NP-UP), not by name, because names are often abbreviated or spelt differently in the list.

DCR panels are mandatory in UP and the vendor must be UPNEDA-empanelled. After MNRE’s March 2026 update, the separate technical feasibility requirement was waived and load enhancement up to 10 kW became automatic. Collateral-free loans are available from nationalised banks at the repo rate plus 0.50 percent, with a tenure of up to 10 years. UP’s target under the scheme is 25 lakh households, the largest of any state.

Solar Subsidy in Haryana – The Biggest Help for Low-Income Families

Haryana gives the largest state grant in north India, but only to lower-income families. An Antyodaya family with annual income up to Rs 1.80 lakh, as per the Parivar Pehchan Patra (PPP), gets a state grant of Rs 25,000 per kW or 40 percent of the cost per kW, whichever is lower, on systems up to 2 kW. That is up to Rs 50,000. Add the central Rs 60,000 on a 2 kW system and the total reaches Rs 1,10,000. This is why solar is cheapest in Haryana for a low-income family.

Families earning between Rs 1.80 lakh and Rs 3 lakh get a grant of Rs 10,000 per kW plus Rs 9,500 per kW as interest-free assistance. General consumers are reported to get a top-up of Rs 10,000 per kW, up to Rs 20,000 on 2 kW. In addition, prompt-paying consumers and state employees can take interest-free assistance of Rs 19,500 per kW up to 5 kW, repaid through the electricity bill over 24 months. Note that this is a loan, not a grant, so it reduces the upfront cost but not the total cost.

For the state grant, the electricity account must be linked to the PPP ID and the application made on the DISCOM’s state financial assistance portal (DHBVN’s is sfa.dhbvn.org.in). The state assistance is limited to 1 lakh Antyodaya families on a first-come, first-served basis. When sources say Haryana offers up to Rs 1.10 lakh, they mean the combined total on a 2 kW system – Rs 60,000 central plus Rs 50,000 state – not the state share alone.

Solar Subsidy in Delhi – Capital Subsidy Plus an Incentive on Every Unit

Delhi is the only place where the money keeps coming after installation. Under the Delhi Solar Energy Policy 2023, domestic consumers get a capital subsidy of Rs 10,000 per kW, capped at Rs 30,000 on 3 kW. On top of that comes a Generation Based Incentive (GBI): Rs 3 per unit for systems up to 3 kW and Rs 2 per unit for systems above 3 kW up to 10 kW, paid for five years. A 3 kW system generating about 300 units a month earns roughly Rs 10,800 a year in GBI, or about Rs 54,000 over five years.

The upfront total in Delhi is Rs 1,08,000 on 3 kW (Rs 78,000 central + Rs 30,000 state), plus the GBI on top. Applications on the Delhi Solar Portal opened on 21 September 2026. One caution: different Delhi government pages have shown different state subsidy figures over time, so always confirm the current amount on the Delhi Solar Portal on the day you apply. Net metering in Delhi runs through BSES Rajdhani, BSES Yamuna and Tata Power DDL.

Solar Subsidy in Assam – The Highest Total for an Ordinary Household

Assam is a special category state, so it gets both a higher central subsidy and a state top-up. The central subsidy in Assam is Rs 33,000 for 1 kW, Rs 66,000 for 2 kW and Rs 85,800 for 3 kW or more. The state government adds Rs 15,000 per kW, capped at Rs 45,000 on 3 kW. Together that is up to Rs 1,30,800 on a 3 kW system – the highest combined subsidy for an ordinary household anywhere in India.

The Assam state top-up was initially fixed for up to 1 lakh households. Before you plan your budget, confirm with APDCL (Assam Power Distribution Company Limited) whether the state subsidy window is still open, how much allocation remains, and whether you qualify. Applications are made on the national portal, and APDCL is the implementing agency.

Solar Subsidy in Rajasthan – Top-Up Only for Free-Electricity Scheme Beneficiaries

Rajasthan’s top-up goes only to households registered under the Mukhyamantri Nishulk Bijli Yojana, the scheme that gives 150 units of free electricity a month. Registered consumers who install a 1.1 kW or larger system get a flat state subsidy of Rs 17,000 per system. This is confirmed by a JVVNL order, which states that in addition to the central assistance, DISCOMs will pay Rs 17,000 per system as state subsidy to consumers registered under the scheme.

For a 1.1 kW system the math is: Rs 33,000 from the Centre plus Rs 17,000 from the state, totalling Rs 50,000, which roughly equals the full cost of the system. So eligible families get a 1.1 kW system almost free. But a household that is not registered under the free-electricity scheme gets only the central Rs 78,000. Rajasthan makes up for this with the best sunlight in India – a 3 kW system in Jaipur or Jodhpur generates more units a year than the same system in Delhi or Lucknow, so the payback period is shorter even without a top-up.

Solar Subsidy in Bihar – A Different Picture for General and BPL Households

Bihar is the state where online sources disagree most, so honesty matters here. Some websites claim a general state top-up of Rs 15,000 per kW, or Rs 45,000 on 3 kW, for all domestic consumers via BREDA. Other major guides state clearly that there is no separate state subsidy for general households in Bihar and that the central Rs 78,000 is the only subsidy. A third source cites a Bihar Cabinet decision of 12 August 2026 approving Rs 10,000 per kW capped at Rs 20,000 per consumer. These three claims cannot all be right, and none of them could be confirmed from an official government notification for this guide.

So this guide does not present any general top-up for Bihar as confirmed. Before applying, check the current position with BREDA (Bihar Renewable Energy Development Agency) or your DISCOM (NBPDCL or SBPDCL). What is confirmed for Bihar is the BPL scheme, covered in the next section. Farmers looking for solar pumps should also read our PM Kusum Yojana 2026 guide.

Tamil Nadu, Karnataka, Gujarat and Maharashtra – Where There Is No Top-Up

Tamil Nadu’s Chief Minister’s Solar Rooftop Capital Incentive Scheme is often quoted as Rs 20,000 per kW, but the actual rule needs careful reading. As per TEDA’s scheme, the subsidy is Rs 20,000 per kWp and only 1 kWp plants for individual residential consumers are considered, with a TANGEDCO connection under tariff LA-1A. That means it is a flat Rs 20,000, not Rs 60,000 on a 3 kW system. The scheme’s deadline was also extended only until 31 March 2026, so check with TEDA whether it is still open before you count on it. Several websites have wrongly multiplied the figure to 3 kW.

Karnataka has no state top-up. Multiple current guides confirm that Karnataka homeowners get only the central subsidy of up to Rs 78,000. BESCOM’s earlier Soura Gruha Yojane is no longer active, and KERC’s new DSPV Regulations 2026 changed the net metering rules but added no state cash top-up. Gujarat is similar: some websites claim a top-up of Rs 10,000 per kW (up to Rs 20,000) via GEDA, but this could not be confirmed officially, so Gujarat is treated here as central-only. Maharashtra also has no general top-up for ordinary consumers, but it has the SMART scheme for BPL families, described below.

Solar Subsidy for BPL Families – Free Panel Schemes

For poor families the story is very different. In an ordinary subsidy the family pays first and the subsidy comes later. In BPL schemes the Centre and the state together cover almost the whole cost, so the system is nearly free. Three states run the biggest BPL solar schemes.

Bihar – Kutir Jyoti Yojana (1.1 kW Free)

Bihar’s Kutir Jyoti Yojana is India’s largest BPL solar scheme. BPL and Kutir Jyoti connection holders get a 1.1 kW rooftop solar system installed completely free. Each system costs about Rs 60,000: Rs 33,000 comes from PM Surya Ghar and Rs 27,000 from the Bihar government’s Mukhyamantri Vidyut Upbhokta Sahayata Yojana. The family pays nothing at any stage. The overall target is 58.89 lakh BPL households. Phase 1 covered about 2.5 lakh Kutir Jyoti consumers under a 275 MW project approved by BERC (Bihar Electricity Regulatory Commission) in June 2026. The phase 1 application window ran from 28 February to 31 March 2026 and is now CLOSED. Phase 2 has NOT been announced yet. This must be stated honestly: if anyone tells you to apply right now, first check the Suvidha App or your local electricity office for the current open window. The scheme is confirmed by BERC’s order dated 10 June 2026, which records the Rs 33,000 central assistance for a 1.1 kW system. Systems are installed under the RESCO model with 10 years of free maintenance, and families keep getting 125 units of free electricity a month.

Rajasthan – Rs 50,000 for a 1.1 kW Plant

In Rajasthan, beneficiaries of the Mukhyamantri Nishulk Bijli Yojana can get a 1.1 kW plant at almost no upfront cost: Rs 33,000 from the Centre plus Rs 17,000 from the state, totalling Rs 50,000, which roughly matches the system cost. The first 10 lakh beneficiaries also get a Rs 1,100 DISCOM incentive and a free smart meter. Consent is given on the Bijli Mitra portal, and the household keeps getting up to 150 units of free electricity a month after installation.

Maharashtra – SMART Solar Scheme (BPL Families Pay Only Rs 2,500)

Maharashtra’s Swayampurna Maharashtra Residential Rooftop (SMART) Solar Scheme was launched in October 2025 for households consuming less than 100 units a month. The benchmark cost of a 1 kW system is fixed at Rs 50,000. BPL households get Rs 30,000 from the Centre and Rs 17,500 from the state – Rs 47,500 in total – and pay only Rs 2,500. SC and ST households get Rs 30,000 from the Centre and Rs 15,000 from the state – Rs 45,000 in total – and pay Rs 5,000. Economically weaker general households get Rs 30,000 from the Centre and Rs 10,000 from the state – Rs 40,000 in total – and pay Rs 10,000. The scheme targets about 5 lakh households, including 1.54 lakh BPL and 3.45 lakh economically weaker families, and is implemented by MSEDCL. The benchmark rate was later revised down to Rs 45,450 per kW, which reduces the family’s share further.

Haryana – Up to Rs 1.10 Lakh for Antyodaya Families

In Haryana an Antyodaya family gets up to Rs 1,10,000 in total support on a 2 kW system: Rs 60,000 from the Centre plus Rs 50,000 from the state. This is the highest combined figure for a low-income family in the country, but it is limited to 1 lakh Antyodaya families on a first-come, first-served basis.

State BPL scheme System Total support Family pays
Bihar Kutir Jyoti Yojana 1.1 kW Rs 60,000 (Rs 33,000 + Rs 27,000) Nothing, fully free
Rajasthan Mukhyamantri Nishulk Bijli Yojana 1.1 kW Rs 50,000 (Rs 33,000 + Rs 17,000) Almost nothing
Maharashtra SMART Solar Scheme 1 kW Rs 47,500 (Rs 30,000 + Rs 17,500) Only Rs 2,500
Haryana Antyodaya top-up 2 kW Rs 1,10,000 (Rs 60,000 + Rs 50,000) Remaining cost, about Rs 40,000

How to Apply for Solar Subsidy – Step-by-Step Guide

The application process is the same across India. Only the state portion differs by portal. Follow the steps in order.

Step 1 – Register on the national portal. Go to pmsuryaghar.gov.in and click “Apply for Rooftop Solar”. Enter your state, DISCOM, consumer number, mobile number and email, and verify with OTP to create your account.

Step 2 – Choose the right vendor. The portal lists registered vendors in your area. Install only through an empanelled vendor, because a non-empanelled vendor means no subsidy. Get the rate, panel brand, DCR certificate and ALMM listing confirmed in writing before you pay anything.

Step 3 – Get feasibility and approval. The vendor will inspect your roof and seek approval from the DISCOM. After MNRE’s March 2026 update, the separate technical feasibility requirement was waived for systems up to 10 kW and load enhancement up to 10 kW became automatic.

Step 4 – Installation. After approval, the vendor installs DCR panels and the inverter. Check the panel nameplate for ALMM and DCR details during installation. Fitting a cheap imported panel is the most common reason subsidies are lost.

Step 5 – Net meter and inspection. The DISCOM inspects the plant and installs the net meter. Only after the net meter is fitted does the system connect to the grid and start generating.

Step 6 – Submit bank details and claim the subsidy. Log in to the portal, submit your bank account details and redeem the subsidy. The central subsidy usually reaches the bank account within 15 to 30 days of DISCOM approval.

Step 7 – Claim the state top-up. In UP, nothing extra is needed – the state subsidy follows about 7 days after the central claim. In Haryana, apply separately on the DISCOM’s state assistance portal. In Delhi, apply on the Delhi Solar Portal. In Rajasthan, give consent on the Bijli Mitra portal. In Bihar, BPL families give consent on the Suvidha App. Check your state’s step in the table above.

Documents needed: electricity bill or consumer number, Aadhaar card, bank passbook or cancelled cheque, rooftop photos, and house papers. There is no application fee. If any agent or vendor asks for money just to apply, that is wrong – the government portal is free.

How to Check Your Subsidy Status

Every applicant asks the same question: when will the money come? There are two ways to check. First, log in to the national portal and see your application stage: registration, feasibility, installation, inspection, net meter, and subsidy. The subsidy is released only after DISCOM approval and after you submit bank details and redeem the claim.

Second, in states like UP you can check the published lists. UPNEDA publishes State Subsidy Lists on its website. The latest, List 68 dated 24 September 2026, covers 34,060 approved applicants, 113,016 kWp of capacity and Rs 102.17 crore of state subsidy. The earlier List 67, dated 31 August 2026, was the largest recent batch with 90,949 applicants and Rs 272.83 crore. Search by your application number (starting with NP-UP), not by name, because names are often abbreviated in the list.

In Delhi the subsidy status is checked on the Delhi Solar Portal, and in Haryana on the DISCOM portal. If your subsidy is delayed beyond 30 days, first ask your vendor, then contact the DISCOM office. The most common causes of delay are a wrong bank account, a bank account not linked to Aadhaar, or a mismatch in the applicant’s name.

Net Cost Examples – What You Actually Pay for 1 kW, 2 kW and 3 kW

After the subsidy, the real question is how much comes out of your pocket. The examples below assume a 3 kW system costing Rs 2,00,000. This is an example price only – the real price varies by vendor, city, panel brand and roof structure. Treat these figures as a comparison, not a final quotation.

State 3 kW system price (example) Total subsidy Net cost to you
Assam Rs 2,00,000 Rs 1,30,800 Rs 69,200
Uttar Pradesh Rs 2,00,000 Rs 1,08,000 Rs 92,000
Delhi Rs 2,00,000 Rs 1,08,000 + GBI Rs 92,000 + 5 years of incentive
Rajasthan (Nishulk Bijli beneficiary) Rs 2,00,000 Rs 95,000 Rs 1,05,000
Karnataka / Gujarat / Maharashtra (general) Rs 2,00,000 Rs 78,000 Rs 1,22,000
Uttarakhand / Himachal Pradesh Rs 2,00,000 Rs 85,800 Rs 1,14,200

For smaller systems: a 1 kW system typically costs Rs 65,000 to Rs 75,000. In UP the subsidy on 1 kW is Rs 45,000, so you pay Rs 20,000 to Rs 30,000. A 2 kW system typically costs Rs 1,30,000 to Rs 1,50,000. In UP the subsidy on 2 kW is Rs 90,000, so you pay Rs 40,000 to Rs 60,000. In Haryana an Antyodaya family gets Rs 1,10,000 on a 2 kW system, so on a Rs 1,50,000 system they pay only about Rs 40,000.

On payback: a 3 kW system generates about 300 to 360 units a month. If your monthly bill is Rs 2,500 to Rs 3,000, the system can pay for itself in 3 to 5 years. After that, you get nearly free electricity for 20 years or more. Payback is faster in Delhi because of the GBI, and faster in Rajasthan because of stronger sunlight.

Five Mistakes That Get Applications Rejected

First, installing imported or non-DCR panels – the subsidy applies only to Indian-made, ALMM-listed panels. Second, using a vendor who is not empanelled with your DISCOM. Third, applying in a name different from the name on the electricity bill – always apply in the bill holder’s name. Fourth, submitting incomplete documents or roof photos. Fifth, paying an agent for the application – the government portal charges no fee. Avoid these five mistakes and the chance of rejection falls sharply.

If you need a loan, nationalised banks offer collateral-free loans at the repo rate plus 0.50 percent, with a tenure of up to 10 years. Talk to your bank before installation so that money is ready when the vendor starts work.

FAQ – Solar Subsidy by State

Can I claim both the central and the state subsidy?

Yes. The state top-up is paid in addition to the central subsidy, not instead of it. You are eligible for both from a single application, though some states need an extra step on a state portal.

Which state gives the highest solar subsidy in India?

For an ordinary household, Assam gives the highest total: up to Rs 1,30,800 on 3 kW. For low-income Antyodaya families, Haryana gives up to Rs 1,10,000 on 2 kW. For BPL families, Bihar’s Kutir Jyoti Yojana installs a 1.1 kW system completely free.

Do general households in Bihar get a state top-up?

Reports disagree and no official confirmation was found for this guide. Some sources claim Rs 45,000, others Rs 20,000, and others say there is no general top-up at all. Check the current position with BREDA or your DISCOM before applying. The Kutir Jyoti BPL scheme is separate and confirmed.

When does the subsidy reach my bank account?

The central subsidy usually arrives within 15 to 30 days of DISCOM approval and submission of bank details. In UP the state subsidy follows about 7 days after the central claim. If it takes longer than 30 days, contact your vendor and then the DISCOM.

Can tenants get the solar subsidy?

The subsidy goes to the person whose name is on the electricity connection and who has the right to use the roof. A tenant needs the written consent of the house owner, and the application must be in the electricity bill holder’s name.

Will the subsidy increase if I install more than 3 kW?

No. The central subsidy stops at Rs 78,000 on 3 kW. State top-ups also have their own caps: Rs 30,000 in UP, Rs 30,000 in Delhi and Rs 45,000 in Assam. A bigger system generates more electricity and lowers the bill further, but the subsidy does not rise.

How do I get a loan for rooftop solar?

Nationalised banks offer collateral-free loans at the repo rate plus 0.50 percent, with a tenure of up to 10 years. Carry a copy of your portal application and the vendor’s quotation when you apply for the loan.

State solar subsidies change from time to time, so always check the latest figures before you apply. Choosing the right state benefit, the right vendor and the right panel is the smartest decision you can make. If you live in UP, Haryana, Delhi or Assam, you can get the biggest benefit. If you are a BPL family, ask your local electricity office about the free-panel scheme in your state.

private information portal, not a government website – The information on GramSuvidha is for general information only. Subsidy amounts and rules can change from time to time. Always check the latest information on the official portal before applying.